INFRASTRUCTURE
The Challenges of Consolidating Development
-
Food Security

-
Health for All
-
Education & Poverty Alleviation
-
Infrastructural Development: Energy,
Water, Roads…
“We have the Vision and the Political will to
promote private
sector growth and create the enabling environment to
attract Direct Foreign Investment (DFI) and engage
on PPP based-projects to create a new socio-economic
status in our local economy. Our
11 Point Agenda is designed to compliment Mr.
President’s 7 Points Agenda to empower, reconstruct
and re-engineer our economy positively while aiming
to achieve Vision 2020” …Gov. Namadi Sambo
ADDRESSING THE ISSUE OF ENERGY
The State’s energy supply plays a major part in
contributing to its enduring economic success. Thus,
the issue of domestic Water Supply and Hydropower
became a higher priority
– to ensure that there is adequate supply of
electricity to meet growing consumer and industrial
demand and help ensure continued economic success
into the future.
One of the major constraints in the past to water
resources and hydro development is the lack of basic
planning data.
Kaduna State Energy Action Plan
1. Development of Major Dams with Hydroelectric
Power Generation Potentials in Kaduna State
2. The Gurara Dam Hydro Scheme
3. The Emergency Power Fuel Plant
The Emergency Power
Fuel-oil Plant to generate 100 Megawatt
This is one area where Kaduna State is going to
generate 100MW through PPP in order to address the
current problem that has led to the closure of our
industries in Kaduna State.
As a result an SPV has been established with
Geometric Alphine, a Nigerian Power Generation
Company and our application to benefit from the
China Exxim Bank credit buyer facilities (managed by
Nexxim Bank) has been submitted.
A project site has been allocated and the designed
completed including the design of the 132/33kV
Sub-station that will evacuate the power to the
industrial area
Addressing the issue of water: Kaduna and Zaria
Regional Water Expansion Schemes
KADUNA
•
A new Dam of 129 mcm for a Design Horizon of 2035
-
A new Water Treatment Plant of 170,000 m3/d for a
Design Horizon of 2025
-
New Transmission Mains and reservoirs
-
Pipe Network Extensions and strengthening of 433km
in the existing town

-
Pipe Network Extension in the New Eastern Sector
-
Replacement of existing Asbestos Cement Pipes of
361km
ZARIA WATER SUPPLY EXPANSION PROJECT
-
Engineering Design Review and Construction
Supervision
-
Dredging of the existing Shika Dam

-
Construction of 150,000m3/d Water Treatment Plant
-
Construction of Transmission Mains
-
Construction of 8 Service Reservoirs

-
Laying of 200km of Network Expansion in Zaria
Metropolis
-
Replacement of 431km of existing Asbestos Cement
Distribution Network
Addressing
issue of Transportation - The State is building
roads to link all LGAs
|